You have all tools, acclimatized your boards and have a perfectly level sub floor, you are ready to start installing your laminate floor. The main 7 steps to doing this are:

Step 1 installing hardwoor laminate flooring.

Determine what direction the laminate boards will lay. The planks lay in a direction away from the light. Usually it`s light coming from outside through a door or window.

Step 2 installing hardwoor laminate flooring.

The first board laid with one end against a wall and one side against an adjacent wall. Place plastic spacers that come with the boards between the board and the walls. When finished laying the bamboo laminate flooring, these will be removed and the space will give the flooring room to expand if necessary.

Step 3 installing hardwoor laminate flooring.

Fit the end of a second board into the the end of the first board, again placing spacers between it’s side and the wall. Use the hammering tool to lightly hammer each board into the next. Continue to do this until there is not enough place between the end of the last board and the approaching wall. Measure the distance between the end of the last board and the approaching wall and cut a board to this length (less the size of a spacer). Then place this cut down board into the end of the last board laid and place spacers at the end of the newly laid board and between it and the wall. Now your first row laid.

Read also:  How to Repair Laminate

Step 4 installing hardwoor laminate flooring.

Use the off cut from the last laminate board as the first board of the next row, if the off cut is long enough. If it is not long enough, then start the second row with a standard board beginning from the end that you finished the first row with. The aim here is to have the ends of the boards in each row staggered so that they do not line up.

Step 5 installing hardwoor laminate flooring.

Use aluminium mouldings to finish off boards that end in a doorway leading outside or into another room that has a different floor covering. These can usually be bought at your hardwood laminate flooring retailer. Similarly, you can use moulding to connect laminate flooring in doorways between rooms where both rooms have laminate flooring. Alternatively, you can continue the same boards from one room into another but this can be tricky. Sometimes it requires shaving down the tongue in a tongue and groove system so that a board on one side of the door will easily slide straight into a board on the other side. Note that the only way to do this is to have both boards running along the doorway, not through it.

Step 6 installing hardwoor laminate flooring.

Continue with this until the entire floor has been covered with hardwood laminate boards. After this remove all spacers.

Step 7 installing hardwoor laminate flooring.

If you already have skirting boards and the flooring has been laid up to them, then you will use moulding to cover the gap between the flooring and the skirting boards. Otherwise if the flooring has been laid up to the bottom of the walls, then you will now install skirting boards to cover the gap.

Read also:  Laminate class 33

By materials Jeff Peter

Design Ideas Mail
Once a Month New Design Ideas

You will receive:

  • Top Ten Design Ideas In Different Rooms.
  • Tips and Trick to Use in Your Room Decoration.
  • DIY Design Projects.
100% Anti-Spam Protection100% Anti-Spam Protection
1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)

About the author

MaksMaks

Related

JOIN THE DISCUSSION